Select language:  
Click HERE to show NEW files added
Currency:  

 
Search
Advanced search


Users online
9 unregistered customer(s)


Bestsellers
Electrical Testing & Commissioning Method Statement (dead and live testing)
Our price: £5.00
Possible control measures for work in confined spaces
Our price: £0.00
Method statement for the Black building testing (26 Pages)
Our price: £5.00
Fire Panel / sensors Installation method statement (10 pages)
Our price: £5.00
Emergency Lighting Three Hour Battery Test Method statement
Our price: £5.00
Toolbox Talk (154 Pages)
Our price: £5.00


Engineering Forum
Discussion FORUM
Engineering Forum HERE


Help
Contact us
Privacy statement
Terms & Conditions

Unsubscribe Newsletter
OTHER MAINT ITEMS
Ohm's Law Calculator
Cable Size Calculator
Resistor values
Unit Converter
E Calculator
HVAC Forum
About HVAC
What is Reliability Excellence?
Measuring Reliability
Three Waves to Reliability
True Cost of Maintenance
Employee Development
Equipment Maintenance Plans
Risk is in the Management
Risk Assessment FAQ
Avoid the Misguided Application of the Maintenance Planner Scheduler
Managing Assets by Criticality
What are Method Statements and how do I write them?
Written Health and Safety Policy Statement
Departmental Health and Safety Policies
Construction Policy Statements
Lockout Procedures
Hot Works
Evacuation and shelter planning
Possible Terrorist threats
Create HVAC control specifications FREE and online!
Electrotechnical Certification Scheme Quiz
Health and Safety at Work Regulations 1999
Emergency Lighting and the New Fire Safety legislation
Why is risk assesment important



System Maintenance :: HEALTH/SAFETY :: METHOD STATEMENTS :: Method Statements :: Method Statement for unloading / delivery of LV plant equipment to site. (6 pages)

Can't find what your looking for? Try our A-Z
Method Statement for unloading / delivery of LV plant equipment to site. (6 pages)
 

 

System Maintenance Limited

Specialist Electrical and Mechanical Engineers

20A Coleraine Road, London.
N8 0QL

Tel: 07595352580

Fax: 02088883431

 

METHOD STATEMENT

 

Job Number:

Job Number HERE

Project Title:

Project name HERE – LV Switchgear Installation

Description of the Task/Activity:

Installation of switchboard

Client:

Manufacture of switchboard

MS Ref:

MS01 Rev 00

Client Contact:

Client Name HERE

Tel:

07595352580

Engineer:

Engineer Name HERE

Tel:

07595352580

Site Address/ Location:

Site address HERE

Start Date:

22 October 2007

MPE Project Engineers:

TBA

 

Site Contact:

TBC

Tel:

07595352580

Brief description of Works:

Accepting delivery, supervising unloading, moving into position and erecting and testing LV switchboard ref.???.

Method:

 

The switchboard will be delivered to site in separate sections on a Hiab lorry; the lorry will park as close as is practical to the switchroom door.   The lorry driver will off load the separate sections of switchgear using the Hiab crane.

 

In order to move the panels into the switchroom the panels will be laid on their side and moved manually into the switchroom.   Temporary doors may restrict access into the switchroom; if this is the case, the client is to arrange for the doors to be removed whilst the switchboard sections are installed.   The heaviest section of switchgear weighs approx 600 kg and therefore a mobile lifting frame with block and tackle will be employed to return the sections to an upright position.   Once in position the panels will be sited in the position to be identified by the client’s engineer.

 

The erection of the panel will be carried out in accordance with the manufactures recommendations.

 

After completion of the erection testing will be carried out in accordance with the manufactures recommendations.

 

Details
 
SKU SKU48542111
Weight 0.02 Kgs
Price: £5.00

Options
 
Quantity 1 (this product is downloadable)

Add to cart
        
Add to wish list
         Bookmark and Share System Maintenance



Send to friend
Your name: *
Your e-mail: *
Recipient's email: *

Send to friend

Related products

ALL FILES ON THIS WEB SITE (1045 Files - 92,124 KB - 92.1 MB )
Our price: £250.00


Evacuation Guidance (4 Pages including Evacuation Flow Chart) - A must need document for all companys.
Our price: £5.00


All three lockout files
Our price: £5.00


ALL HVAC EQUIPMENT PREVENTATIVE MAINTENANCE TASKS (52 Items)
Our price: £52.00


HVCA Standard Maintenance Specification for services in buildings (496 Pages)
Our price: £0.00


HIGH PERFORMANCE SCOPES OF WORK (52 Pages)
Our price: £5.00


Recommended products list

DRAINAGE ABOVE GROUND - SOIL & VENT PIPEWORK


GENERATORS - CONTROL PANEL


LV and HV Cabling separation from hazardous services


KITCHEN EQUIPMENT - COOKING - GAS COMBINATION OVEN


FINAL CIRCUITS - EMERGENCY LIGHTING CENTRAL SYSTEM


Risk Assessment Use Of Mobile Scaffold Towers


FIRE EXTINGUISHERS 4Y


FUEL SYSTEMS - GAS BOOSTERS


TANKS COLD WATER STORAGE / FEED & EXPANSION


Safe use of gas cylinders


Customer feedback
Product rating


Voting

Rate It!


Customer Reviews


There have been no reviews for this product.

 
Your cart
Cart is empty

View cart
Checkout
Wish list
Orders history


Authentication
Username

Password

Remember Me
Log in 
Register 
Recover password

If Javascript is disabled in your browser click here


Shop by Price
FREE
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9-10
10-50
50-100
100-200
200 +


We accept
We accept Visa, MasterCard, Visa Delta, JCB, Visa Electron, Maestro, Switch and Solo
Cheque / Money Order
Nochex


Information

The files on this web site may be out of date due to the rapid changes in the HVAC industry and we recommend that you do not rely on the data provided. The data and information provided is a guide only.

We accept all major credit cards.
Hacker Proof
Secure Shopping
Secure Shopping
Secure Shopping


Web Sites
business-maintenance
factory-maintenance
system-maintenance
planed-maintenance
maintenance-task.com
www.site-maint.com
www.buyppm.com


Gift Vouchers
Gift Voucher


Contact Information

Office Address
20 Coleraine Rd,
London. N8 0QL

Phone
+44 7050236313
Fax
+44 2088883431
E-Mail
paul@buyppm.com
Working Hours
24 hrs a day, 7 days a week, 52 weeks a year
Appointments
Contact the above number.


Bookmark Site
Remember this Web Site
Boomark us


Bookmark and Share System Maintenance


Products
Products Online
1117 Products
Online


Special
Gift certificates



News
04-02-2010

Hi, we have just uploaded the FREE 17th Edition wiring regulations exam test software for you to download and test yourself.

The NEW 17th edition wiring regulations software can be found HERE which has 2382-10 (30 questions) and 2382-20 (60 questions)

You will find every time you do the test the questions will be different and this software has all the exam questions.

At the end you will be given either a PASS or FAIL and a list of the answers for you to know where you went wrong.

Remember you can pay for a FULL membership which entitles you to download any files from our large database FREE, for more information click HERE.



Previous news

Your email:

Type the characters you see in the picture. (If you do not see any picture here, please enable images in your web browser options and refresh this page):

Get a different code
Subscribe 



Users online:  9 unregistered customer(s)